The well location on lineaments joining Nakkavagu highly contaminated
water in Kanjerla village during 1995. Peddavagu is also controlled by
another lineament.
The annual rainfall is about 870 millimetres and the south-west monsoon
brings about 700 millimetres. The groundwater recharge varies from 100
and 110 millimetres, which is an average recharge computed from the database
formed in 1974 to 1989.
|
|